|
|
Equipment Operation in Wetlands (Rule Four: 26.6.604) IllustrationClass 1, 2, and 3 StreamsSlopes less than or equal to 35% SMZ boundary 50 feet. The equipment operation boundary follows the SMZ boundary, including where it has been extended to include wetlands that are contiguous with the stream. The equipment operation boundary is also extended to include isolated wetlands that straddle the 50-foot SMZ boundary. Operate under the following conditions:
< Back to Streamside Management Zone (SMZ) Law Last Modified: 07/05/2007 |
|
|
|